five

ACROSS_LISA_PRG_AETH-eBC_PM1_1-Min_L2

收藏
DataCite Commons2025-04-09 更新2024-07-03 收录
下载链接:
https://across.aeris-data.fr/catalogue/?uuid=14680d3e-43b8-447c-9230-a1e153777cd3
下载链接
链接失效反馈
官方服务:
资源简介:
The PM1 aerosol equivalent black carbon (eBC) concentration was measured at the ground–based PRG urban site during ACROSS by a dual spot aethalometer (AE33, Magee Sci). The instrument was installed in a dedicated measuring room at the 7th floor of the Lamark B building of Université Paris Cité. Air was taken from a common certified PM1 sampling head located on the roof of the building at about 30 m height above the ground level. A copper tube of 7 mm inner diameter and 10 m length connected the PM1 head to a 4–way stainless steel flow splitter (TSI) located in the measuring room that dispatched the air flow to different instruments. The AE33 sampled air from this common line with a flow rate of 2 l min–1. Data were acquired continuously at 1-min time resolution. The time indicated in the datafile is the start time of the 1-min interval. Multiple zero check were performed during the campaign to evaluate possible offset baseline and instrument noise. The eBC data reported by the instrument at 880 nm were considered. Data are reported to i) instrument temperature and pressure (eBC), T=294.26 K and pressure P=1013.25 mbar), ii) Standard Temperature and Pressure (eBC_STP) conditions (STP, T=273.15 K P=1013.25 mbar). Meteorological data (T, P) measured at the site are reported in the file for facilitating the conversion to ambient T and P conditions if desired. The uncertainty (10%) given in the dataset is based on (Cuesta-Mosquera et al., 2021) and accounts for instrumental noise. Raw data were controlled manually to check periods when specific conditions prevented to do measurements or affected the quality of the measurements (power cut, zero check, disconnection from the sampling line, disfunctioning). Data in correspondence of these periods are identified as -9999.999 and flagged with a “M” (missing). Valid data are reported with a “O” flag (operation). Different periods were affected by rain on the 19–23, 24–27 and 30 June and 4, 19–20 and 22 July. Detailed information on the rainy periods can be provided upon request to the authors and the principal investigators. Measurements for the 13 July-18 July period are not reported because the PM1 head was accidentally disconnected during this period, therefore not ensuring a PM1 sampling. Those data can be provided upon request.
提供机构:
Aeris
创建时间:
2023-12-15
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作