遇见数据集

Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications

收藏
OpenEI2026-03-14 收录
官方服务:

资源简介:

Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.

二维码
社区交流群
二维码
科研交流群
商业服务