five

National Estuarine Research Reserve Nutrient Metadata (January 2002-December 2002) Latest Update: July 14, 2004

收藏
Global Change Master Directory (GCMD)2026-04-25 收录
下载链接:
https://cmr.earthdata.nasa.gov/search/concepts/C1214590761-SCIOPS.html
下载链接
链接失效反馈
官方服务:
资源简介:
Nutrient monitoring is conducted at 26 National Estuarine Research Reserves (NERR) from four locations within or adjacent to the reserve on a monthly basis of the following parameters: orthophosphate, ammonium, nitrite, nitrate, and chlorophyll a. Note: Reserves may collect additional parameters which are available by searching the Yearly Files directory. Research objectives a) Monthly Grab Program: The objective of this monitoring program is to provide baseline information on inorganic nutrient and Chla water quality status in the Delaware NERR while also contributing to baseline information nationally. The five sites chosen for monitoring will assist in understanding the impacts of both urban and agricultural impacts on the watersheds. b) Diel Sampling Program: The objective of this monitoring program is to provide baseline information on inorganic nutrient and Chla water quality status in the Delaware NERR. The diel sampling program attempts to capture a more comprehensive view by assessing fluctuating nutrient amounts throughout a lunar tidal cycle. The site chosen for monitoring will assist in understanding the impacts of both urban and agricultural impacts on the watersheds. SUPPLEMENTAL INFORMATION: Associated researchers and projects The DNERR water quality monitoring program occurs at the corresponding nutrient sample sites. A YSI 6600 datasonde is deployed at each site measuring: dissolved oxygen, salinity, specific conductivity, water temperature, depth, turbidity, and pH. Weather data is collected in both the St. Jones River and Blackbird Creek watershed near nutrient/water quality sites as another portion of the NERRS SWMP program. An additional stormwater sampling program is underway to analyze the impact of agricultural BMP's at sites in the Blackbird Creek Watershed, St. Jones River Watershed. Other Remarks a.) The diel sample taken on August 5/6, 2002 supplements the missed July diel sampling date. On July 22, 2002 equipment failure shut the Isco sampler down and samples were not collected. b.) No grab samples were taken for the month of August due to staffing limitations and rain delays at the end of the month. c.) Grab samples collected on November 26, 2002 were subject to a mix-up at the VIMS analytical laboratory. CHLA analysis was performed during the normal timeframe, but samples were misplaced at VIMS for other nutrient analyses. In late April 2002 the problem was identified by the DNERR and the original samples were located at VIMS. Analyses of other parameters excluding CHLA and PHEA were run in late April once located. d.) Grab samples from December 10, 2002 were subject to a mix-up at the VIMS analytical laboratory. Chl-A analysis was performed during the normal timeframe, but samples were discarded at the lab for other nutrient analyses. In late April 2002 the problem was identified by the DNERR and frozen remnant samples stored by DNERR were resent for analysis of other parameters excluding CHLA and PHEA. e.) Diel data set on December 16/17, 2002 is missing three samples (12/17: 0400 EST, 0900 EST, 1130 EST). These bottles were empty upon sampler retrieval, presumably caused by intake hose freezing. f.) Rainfall for 2002: January Rain amount (mm) 6 26.416 7 .762 11 10.922 19 13.716 20 4.826 21 2.032 23 1.016 24 3.048 25 3.048 31 1.016 March Rain amount (mm) 2 11.938 3 5.080 10 .762 12 1.778 13 10.922 16 .508 17 4.318 18 18.288 20 23.622 26 17.526 27 6.604 31 17.272 April Rain amount (mm) 1 2.540 3 4.318 9 12.954 10 6.096 12 7.620 16 4.064 20 .508 21 .508 22 5.588 25 4.318 26 .508 27 2.794 28 57.912 May Rain amount (mm) 2 26.670 4 3.556 5 1.016 7 .254 12 34.798 13 8.128 14 .508 17 1.524 18 22.606 June Rain amount (mm) 4 .254 5 12.446 6 22.352 7 1.778 13 3.048 14 4.826 15 .254 18 .508 19 .762 27 .762 28 .254 July Rain amount (mm) 9 .762 10 4.318 14 2.286 15 .254 23 37.084 24 .762 25 7.366 27 7.620 28 1.016 August Rain amount (mm) 6 1.270 24 13.462 28 24.384 29 41.656 31 .254 September Rain amount (mm) 1 102.362 2 2.286 8 .254 9 .254 15 4.064 16 12.954 23 .254 26 20.574 27 4.826 28 3.048 October Rain amount (mm) 9 .762 10 63.500 11 29.464 12 1.016 13 2.794 15 2.794 16 37.084 17 1.270 18 .254 20 .254 23 .254 25 14.224 26 16.002 28 .508 29 23.876 30 10.160 31 1.270 November Rain amount (mm) 5 14.986 6 10.160 11 8.636 12 26.670 13 6.604 16 57.658 17 20.320 19 .254 21 7.366 22 4.826 27 3.302 30 1.270 December Rain amount (mm) 5 1.270 6 2.286 7 3.810 8 2.794 11 36.830 13 18.288 20 16.256 22 .254 24 .762 25 19.558 30 .254 CURRENTNESS REFERENCE: Observed
提供机构:
SCIOPS
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作