five

Parameters of LID Facilities.

收藏
Figshare2025-05-13 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/Parameters_of_LID_Facilities_/29055099
下载链接
链接失效反馈
官方服务:
资源简介:
Challenges such as poor drainage systems and limited space for renovation often arise during the sponge city transformation of old urban residential communities. This research focuses on an old residential community in Beijing utilizing the SWMM in combination with the NSGA-II algorithm. A Pareto optimal curve was identified iteratively, with construction costs, runoff reduction effects, and node overload time as the optimization objectives and the maximum area for the low impact development (LID) layout as a constraint. After transformation using LID measures, the runoff reduction rate is directly proportional to the construction cost. However, the rate of runoff reduction increases marginally when the construction cost exceeds 1.4 million yuan. Additionally, the average node overload time decreases as the construction cost and runoff reduction rate increase. Therefore, selecting a transformation scheme requires comprehensive consideration of factors such as budget and land use type in practice.
创建时间:
2025-05-13
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作