本数据集包含论文“The parallel AGV Scheduling Problem with battery constraints: a new formulation and a matheuristic approach”中提出的ASP-BC问题的真实与模拟实例,以及求解方法的详细结果。数据集共包含2个文件,无目录结构,可用于分析并行AGV调度问题的优化方法与性能。 论文“The pa
Experiment result contains two tables, which are the experimental results of AGV scheduling simulation experiment 1 (different machine processing time) and simulation experiment 2 (different AGV numbe