Proposed rock batter rectification Victoria Pass, Mount Victoria : environmental impact statement
收藏Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/proposed-rock-batter-impact-statement/3841924
下载链接
链接失效反馈官方服务:
资源简介:
This environmental impact statement (EIS) documents investigations for proposed works to rectify an unstable rock batter located adjacent to the Great Western Highway at Mount Victoria. The project involves removal of the unstable sections from the rock batter and top boulder slope of the batter by controlled excavation. The cutting would be widened and the slope reprofiled to a stable angle. A rock fall buffer zone of six metres width would be provided from the edge of the existing road carriageway tom the rock batter. Extensive landscaping treatments to enhance the appearance of the excavated rock face would be incorporated into the project as well as the implementation of erosion and sedimentation control measures. An indicative construction method is proposed which includes provision for an access track, spoil push down area and stockpiling areas.\n\n**Note:** This resource was originally published on opengov.nsw.gov.au. The OpenGov website has been retired. If you have any questions, please contact the Agency Services team at transfer@mhnsw.au\n\n**Agency**\n \n- Roads and Traffic Authority of New South Wales\n
提供机构:
data.nsw.gov.au