five

Jurisdictional Peaker Power Plants

收藏
California State Geoportal2026-03-28 收录
下载链接:
https://gis.data.ca.gov/maps/79ecc79add6746e5a5420ad62d2465ad
下载链接
链接失效反馈
官方服务:
资源简介:
<div style='font-family: inherit;'><div style='font-family: inherit;'><font size='4' style='font-family: inherit;'>2001 California Emergency Siting Peaker Power Plant Permitting</font></div></div><div style='font-family: inherit;'><br /></div><div style='font-family: inherit;'>In 2001, Governor Davis identified a goal of bringing 1,000 megawatts of new power plants to meet the electricity needs during peak demand periods. Typically these are simple-cycle power plants that can be constructed in a relatively small area, do not require water supplies for cooling, and can readily be connected to the existing transmission and natural gas system. The Governor directed the Energy Commission to use its emergency power plant permitting authority under Public Resources Code 25705 to permit new peaking and renewable power plants that could be online by September 30, 2001.<br /></div><div style='font-family: inherit;'><br /></div><div style='font-family: inherit;'>For more information about Peaker Projects contact:</div><div style='font-family: inherit;'>Joe Douglas</div><div style='font-family: inherit;'>Compliance Project Manager</div><div style='font-family: inherit;'>STEP Division</div><div style='font-family: inherit;'>916-653-4677</div><div style='font-family: inherit;'>Joe.Douglas@energy.ca.gov</div><div style='font-family: inherit;'><br /></div>
提供机构:
California State Geoportal
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作