cr120193
收藏GSQ Open Data Portal2026-03-28 收录
下载链接:
https://geoscience.data.qld.gov.au/dataset/cr120193
下载链接
链接失效反馈官方服务:
资源简介:
PENNYCOED CREEK 1 in was drilled from 13/07/2009 to 30/07/2009.
A Plug and Abandonment was conducted on 12/12/2017.
For P&A details, refer to (Daily Completion & Workover Reports). For Drilling details, refer to (Daily Drilling
Reports).
提供机构:
geological-survey-of-queensland
创建时间:
2020-08-20



