five

Infrastructure Assessments

收藏
DataCite Commons2023-10-11 更新2025-04-16 收录
下载链接:
https://api.odp.saeon.ac.za/catalog/SAEON/go/10.15493/BEA.DATA.10000060
下载链接
链接失效反馈
官方服务:
资源简介:
SAEON calculated a series of pressure maps to relate population, economic activity and biomass potential to the distribution of current and planned infrastructure. The infrastructure that was considered included: * Operational and decommissioned power stations; * Planned new energy infrastructure, based in NERSA permits; * Eskom planned and current transmission, distribution, and substation infrastructure; * Agriculture infrastructure - silos; * Sawmills and sugar mills; * Waste water treatment works and solid waste disposal sites. In each case, an assessment was made on the basis of four categories (below or over median): 1. Close to infrastructure, and high density of population, economic activity, or biomass potential (possibly problematic); 2. Not close to infrastructure, and high density of population, economic activity, or biomass potential (problematic); 3. Close to infrastructure, and low density of population, economic activity, or biomass potential (not problematic); 4. Not close to infrastructure, and low density of population, economic activity, or biomass potential (not problematic)
提供机构:
South African Environmental Observation Network
创建时间:
2018-03-07
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作