Infrastructure Assessments
收藏资源简介:
SAEON calculated a series of pressure maps to relate population, economic activity and biomass potential to the distribution of current and planned infrastructure. The infrastructure that was considered included: * Operational and decommissioned power stations; * Planned new energy infrastructure, based in NERSA permits; * Eskom planned and current transmission, distribution, and substation infrastructure; * Agriculture infrastructure - silos; * Sawmills and sugar mills; * Waste water treatment works and solid waste disposal sites. In each case, an assessment was made on the basis of four categories (below or over median): 1. Close to infrastructure, and high density of population, economic activity, or biomass potential (possibly problematic); 2. Not close to infrastructure, and high density of population, economic activity, or biomass potential (problematic); 3. Close to infrastructure, and low density of population, economic activity, or biomass potential (not problematic); 4. Not close to infrastructure, and low density of population, economic activity, or biomass potential (not problematic)



