five

Adaptive hybrid optimization for integrated project scheduling and staffing problem with time/resource trade-offs

收藏
DataCite Commons2025-11-20 更新2026-02-08 收录
下载链接:
https://borealisdata.ca/citation?persistentId=doi:10.5683/SP3/KJXO1D
下载链接
链接失效反馈
官方服务:
资源简介:
• Proposes a dual-objective optimization model for the Integrated Project Scheduling and Personnel Staffing Problem (IPSPSP) with time/resource trade-offs. •Introduces an adaptive hybrid algorithm combining NSGA-II and MOPSO to optimize project duration and personnel cost. •Utilizes hybrid encoding for activity modes, activity priority lists, and personnel allocation plans to generate project schedules and personnel allocation plans. •Employs a hypervolume-based adaptive search mechanism to improve solution quality. •Experimental results show the proposed hybrid algorithm outperforms standalone NSGA-II and MOPSO in scheduling and resource optimization.
提供机构:
Borealis
创建时间:
2025-10-12
二维码
社区交流群
二维码
科研交流群
商业服务