Supplementary Data for Comparative Study on the Use of S Curve-Bar Chart and Ms Project-Pdm Methods in Scheduling and Controlling Building Construction Project

收藏
DataCite Commons2025-06-01 更新2024-07-28 收录
下载链接:
https://figshare.com/articles/dataset/Supplementary_Data_for_Comparative_Study_on_the_Use_of_S_Curve-Bar_Chart_and_Ms_Project-Pdm_Methods_in_Scheduling_and_Controlling_Building_Construction_Project/14059202/2
下载链接
链接失效反馈
官方服务:
资源简介:
Building construction projects have very complex activities, so they require precise and accurate methods of scheduling and control. Using the right method, the project executor can carry out the project according to plan and can be controlled if there is schedule deviations. This study aims to compare the effectiveness of using the Bar Chart-curve-S and Ms. Project-PDM methods on scheduling and controlling building construction projects. The method used by contractors in scheduling and controlling a project is the Bar Chart-S curve and Ms. Project-PDM method.
提供机构:
figshare
创建时间:
2021-03-29
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作