Table E- 0 - 1 in Saidabad Water Treatment Plant Project, Phase III
收藏资源简介:
Table E-0-1 Evaluation of ecological impacts resulting from different project activities (Originally Table 1) Ecological IssuesSource of Potential ImpactsFloraFishFaunaAmphibiaReptileBirdMammalAQTRAQTRAQTRAQTRAQTRDuring constructionCamp setting0-1 S00-1 S0-1 S0-1 S0-1 SAccess road construction-1 S-1 S00-1 S0-1 S000-1 SLand clearing-1 S-1 S-1 S-1 S-1 S-1 S-1 S0-1 S0-1 SSoil excavation-1 S-1 S-1 S-1 S-1 S-1 S-1 S000-1 SGeneration of Noise00-1 S-1 S-1 S-1 S-1 S-1 S-1 S0-1 SDeterioration of water quality00-1 S-1 S-1 S-1 S0-1 S0-1 S0Sewage discharge on soil / water-1 S0-1 S0-1 S000000Water body crossing (during pipeline construction)-1 S0-1 S-1 S0-1 S0-1 S0-1 S0Traffic0000-1 S0-1 S0-1 S0-1 SDuring OperationSpills (oil / Chemical) on land/water-1 S-1 S-2 S-1 S-1 S-1 S-1 S-1 S-1 S0-1 SWaste/sludge disposal00-1 S-1 S-1 S-1 S-1 S-1 S-1 S0-1 SWater Intake00000000000Generation of Noise00-1 S00000000Traffic0000-1 S0-1 S0-1 S0-1 SLand use00-1 S-1 S0-1 S0-1 S000 [Legend: AQ = Aquatic; TR = Terrestrial; 0 = No impact (negligible impact), 3 = High impact, 2 = moderate impact, 1 = Low impact, S = Short term impact, L = Long-term impact, +/- = positive/negative impact, AQ = Aquatic, TR = Terrestrial]