Results and analysis Midas Tunnel Pile set up.rar

收藏
Figshare2025-04-14 更新2026-04-08 收录
下载链接:
https://figshare.com/articles/dataset/Results_and_analysis_Midas_Tunnel_Pile_set_up_rar/28786766/1
下载链接
链接失效反馈
官方服务:
资源简介:
The Earth Pressure Balance (EPB) tunnel boring in combination of piling and sequential excavation method (SEM) is used to discuss the influence of piled tunnel lining that under crosses an existing tunnel along the Zhongshan Road. Soil investigation data and numerical simulation was applied to analyze the model. The Mohr -Coulomb (MC) model in MIDAS GTS NX software is used to simulate the settlement levels of semicircular tunnel lining and soil against various pile set ups in order to obtain the best set up for ground improvement. Results indicate a substantial variation in vertical settlement. The. designed 5x4 pile set up has the highest crown settlement but optimal lining uplift control by 138-165% while substantially increasing crown displacement by 32-47%. The 4x4 pile performs all-round by reducing uplift by 184-194 % and less volatile settlement by -12% to -47% to within 5-10mm. The 4x4 pile is more reliable and less volatile in both settlement and uplift. Uniform pile set provides a better settlement trough than non-uniform pile setups. Proposed formulas based on Gaussian function reliably uses n and k parameters to predict settlement for greenfield conditions and project behavior for tunnel under-crossings. The green field prediction function is verified using 12 existing projects and n values are estimated at prediction while back-calculation gives values close to known settlements.
提供机构:
Adriko, Norman Burua
创建时间:
2025-04-14
二维码
社区交流群
二维码
科研交流群
商业服务