Dataset for SPBM tunnel geological condition prediction
收藏NIAID Data Ecosystem2026-03-13 收录
下载链接:
https://zenodo.org/record/7037306
下载链接
链接失效反馈官方服务:
资源简介:
This is the operational data collected during the construction of the He Yan Road river crossing project and the corresponding geological information.
创建时间:
2022-08-31



