Lead Service Line (view only)
收藏资源简介:
A feature layer view with view only capabilities. Lead and Copper Rule Revisions (LCRR), published by the EPA, mandates that public water systems develop and submit an initial Service Line Inventory (LCRI) to the Texas Commission on Environmental Quality (TCEQ) and make it available to the public by October 16, 2024. The service line is a pipe that connects the water main (lager pipe that carries water from the treatment plants) to homes and businesses. Dallas Water Utilities (DWU) has developed the Service Line Inventory and is actively updating it by identifying service lines with known materials. This includes the review of existing documentation such as plumbing codes, permits, historical capital improvements and master plans, distribution system maps and drawings, inspection records and any other water system records that indicate the material composition of both public and private service line connections and physical inspections. After initial submission, the Service Line Inventory will be continuously updated by categorizing the material of each service line. The proposed LCRI includes a 10-year timeline for the completion of the Service Line Inventory and the replacement of any lead and galvanized lines requiring replacement, found as part of this effort.<o:p></o:p>



