five

Impact of limited data availability on the accuracy of project duration estimation in project networks

收藏
NIAID Data Ecosystem2026-03-14 收录
下载链接:
https://data.mendeley.com/datasets/bjfdw6xbxw
下载链接
链接失效反馈
官方服务:
资源简介:
This database includes simulated data showing the accuracy of estimated probability distributions of project durations when limited data are available for the project activities. The base project networks are taken from PSPLIB. Then, various stochastic project networks are synthesized by changing the variability and skewness of project activity durations. Number of variables: 20 Number of cases/rows: 114240 Variable List: • Experiment ID: The ID of the experiment • Experiment for network: The ID of the experiment for each of the synthesized networks • Network ID: ID of the synthesized network • #Activities: Number of activities in the network, including start and finish activities • Variability: Variance of the activities in the network (this value can be either high, low, medium or rand, where rand shows a random combination of low, high and medium variance in the network activities.) • Skewness: Skewness of the activities in the network (Skewness can be either right, left, None or rand, where rand shows a random combination of right, left, and none skewed in the network activities) • Fitted distribution type: Distribution type used to fit on sampled data • Sample size: Number of sampled data used for the experiment resembling limited data condition • Benchmark 10th percentile: 10th percentile of project duration in the benchmark stochastic project network • Benchmark 50th percentile: 50th project duration in the benchmark stochastic project network • Benchmark 90th percentile: 90th project duration in the benchmark stochastic project network • Benchmark mean: Mean project duration in the benchmark stochastic project network • Benchmark variance: Variance project duration in the benchmark stochastic project network • Experiment 10th percentile: 10th percentile of project duration distribution for the experiment • Experiment 50th percentile: 50th percentile of project duration distribution for the experiment • Experiment 90th percentile: 90th percentile of project duration distribution for the experiment • Experiment mean: Mean of project duration distribution for the experiment • Experiment variance: Variance of project duration distribution for the experiment • K-S: Kolmogorov–Smirnov test comparing benchmark distribution and project duration • distribution of the experiment • P_value: the P-value based on the distance calculated in the K-S test
创建时间:
2022-11-22
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作