遇见数据集

Dataset of Cost and Schedule Overruns in 19 DoD Acquisition Programs (2003-2017)

收藏
DataCite Commons2025-12-18 更新2025-04-16 收录
官方服务:

资源简介:

<p>This database includes 4 main folders: (i) cost_vs_time, (ii) maturity_vs_time, (iii) text_analysis, and (iv) GAO_pdfs. </p> <p><br /> The first folder (cost_vs_time) contains details about the programs' financial characteristics. This include baseline comparison of program cost (R&D cost, procurement cost and total program cost), acquisition cycle time, and total quantity. </p> <p><br /> The second folder (maturity_vs_time) contains details about the programs' technical characteristics. This include technology maturity and design maturity (as percentages). </p> <p><br /> The third folder (text_analysis) contains the text analysis codes for the narrative descriptions of major reasons for cost and schedule overruns.</p> <p>The fourth folder (GAO_pdfs) contains the original PDFs from which all the data was extracted. </p>

创建时间:
2021-03-08
二维码
社区交流群
二维码
科研交流群
商业服务