Digital Technopole – Intermediate Results
收藏B2FIND2026-04-28 收录
官方服务:
资源简介:
The deliverable D4.1 summarizes the activities conducted in WP4 between month 4 and month 12 of the project. WP4 focuses on setting up all the required (technical, operational,...
交付物D4.1(Deliverable D4.1)总结了本项目第4个月至第12个月期间在工作包4(Work Package 4,WP4)中开展的各项活动。工作包4聚焦于搭建所有必要的(技术、运营……)




