Energy consumption before and after design changes
收藏Mendeley Data2026-04-18 收录
下载链接:
https://data.mendeley.com/datasets/zy629rxh99
下载链接
链接失效反馈官方服务:
资源简介:
The data visualized in the plot represents energy consumption over a specified time period, comparing two scenarios: before and after certain design changes.
X-axis (Time): The horizontal axis represents time in hours, spanning from 0 to 10 hours.
Y-axis (Energy Consumption): The vertical axis represents energy consumption. The energy consumption values are calculated based on the functions E(t) and E_prime(t).
Plot: Two lines are plotted on the graph, each representing energy consumption over time for a different scenario:
Before Changes: This line represents energy consumption before the design changes. It is calculated using the function E(t).
After Changes: This line represents energy consumption after the design changes. It is calculated using the function E_prime(t).
Legend: The legend on the plot indicates which line corresponds to each scenario: "Before Changes" and "After Changes".
Title: The title of the plot is "Energy Consumption Before and After Design Changes", providing a clear indication of what the plot represents.
Gridlines: Gridlines are added to the plot for better visualization and reference.
Overall, this visualization allows for a comparison of energy consumption trends before and after the implementation of design changes, providing insights into the effectiveness of the changes in managing energy consumption over time.
创建时间:
2024-03-27



