Construction projects are exposed to numerous risks that may adversely affect project cost and duration. The purpose of this study is to identify and prioritize key construction risks by combining a Work Breakdown Structure (WBS) with a Risk Breakdown Structure (RBS) and analyzing these risks using two-dimensional (2D) and three-dimensional (3D) risk matrices. In total, 63 risk factors were identified and categorized into five main areas of the work breakdown structure: earthwork, concrete, finishing, mechanical, and electrical. The questionnaire was designed based on each risk category and then sent to engineers, who were asked to estimate the risk probability and its impact. In total, 378 engineers responded. The respondents data were analyzed by using the risk matrix method. Two separate 3D risk matrices were made: one was based on multiplying all three data points, and the other was based on combining both impacts. The results clearly show that the 3D matrix, which combines cost and time impact, yields more accurate results than the matrix that multiplies cost impact and time impact.
创建时间:
2026-03-05
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作