Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times
收藏NIAID Data Ecosystem2026-03-09 收录
下载链接:
https://figshare.com/articles/dataset/Bi-Objective_Flexible_Job-Shop_Scheduling_Problem_Considering_Energy_Consumption_under_Stochastic_Processing_Times/4277390
下载链接
链接失效反馈官方服务:
资源简介:
This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration of the completion time and the total energy consumption under stochastic processing times. The case study on GM Corporation verifies that the NSGA-II used in this paper is effective and has advantages to solve the proposed model comparing with HPSO and PSO+SA. The idea and method of the paper can be generalized widely in the manufacturing industry, because it can reduce the energy consumption of the energy-intensive manufacturing enterprise with less investment when the new approach is applied in existing systems.
创建时间:
2016-12-02



