The Minimum, Mode and Maximum estimates used in the Pert distributions for the parameters of the model (day -1).
收藏figshare.com2023-05-30 更新2025-03-23 收录
下载链接:
https://figshare.com/articles/dataset/The_Minimum_Mode_and_Maximum_estimates_used_in_the_Pert_distributions_for_the_parameters_of_the_model_day_sup_-1_sup_/4024392/1
下载链接
链接失效反馈官方服务:
资源简介:
The Minimum, Mode and Maximum estimates used in the Pert distributions for the parameters of the model (day -1).
模型参数中用于扰动分布的最小值、众数以及最大值的估计值(前一天)
提供机构:
figshare.com



