Replication Data for: Estimating the Economic Cost of Setting up a Nuclear Power Plant at Rooppur in Bangladesh
收藏NIAID Data Ecosystem2026-03-13 收录
数据链接:
官方服务:
资源简介:
This is the data file used in the article for calculating the Levelized Cost of Electricity (LCOE) which is under review for the paper entitled Estimating the Economic Cost of Setting up a Nuclear Power Plant at Rooppur in Bangladesh in Environment Science and Pollution Research
创建时间:
2021-10-27



