On thin ice: Solar geoengineering to manage tipping element risks in the cryosphere by 2040
收藏官方服务:
资源简介:
Table S1 shows the three-year schedule needed to certify a special tanker modification. Table S2 and Table S3 provide sources for data that the authors gathered on the cost, annual movements, total number of runways, and construction timelines for the 17 airports included in the paper.
提供机构:
Zenodo创建时间:
2024-07-16



