Table 4.10 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
收藏官方服务:
资源简介:
Table 4.10. Ambient air quality of the proposed plant site Sample locationsAmbient air pollution concentration in micro gram/cubic meterPM 2.5PM 10SPMSO2NOxCOInside Siddhirganj power plant5711734755.3963.17104complexDuration (Hours)242424242424 Source: 450 MW CCPP environmental team measurements (2010)
提供机构:
World Bank (WB)创建时间:
2025-11-27



