Table 4.10. Ambient air quality of the proposed plant site Sample locationsAmbient air pollution concentration in micro gram/cubic meterPM 2.5PM 10SPMSO2NOxCOInside Siddhirganj power plant5711734755.3963.17104complexDuration (Hours)242424242424 Source: 450 MW CCPP environmental team measurements (2010)