遇见数据集

The score of change in cognitive functions measures of both groups.

收藏
Figshare2015-12-02 更新2026-04-29 收录
官方服务:

资源简介:

Change scores were calculated by subtracting the pre-cognitive measure score from the post-cognitive measure score. The Executive functions were measured by frontal assessment battery at bedside (FAB) and trail making test type B (TMT-B). The processing speeds were measured by digit symbol coding (Cd) and symbol search (SS). The global cognitive status was measured by mini-mental state examination (MMSE). The attention was measured by digit cancellation task (D-CAT), digit span forward (DS-F) and digit span backward (DS-B). We report eta square (η2) as an index of effect size. It is a standardized difference in the change score (post-training score minus pre-training score) between intervention groups (Brain Age, Tetris). η2≥.01 is regarded as small effect, η2≥.06 as medium effect, and η2≥.14 as large effect. SD means standard deviation.

创建时间:
2015-12-02
二维码
社区交流群
二维码
科研交流群
商业服务