five

POWER SECTOR MANAGEMENT FAILURE AND LOAD SHEDDING IN ZAMBIA

收藏
NIAID Data Ecosystem2026-05-02 收录
下载链接:
https://zenodo.org/records/13838024
下载链接
链接失效反馈
官方服务:
资源简介:
This paper examines the management failures within Zambias power sector and their direct linkage to the persistent issue of load shedding. It highlights the critical role of ZESCO, the state-owned utility, in navigating financial constraints while attempting to meet the electricity demands of both domestic consumers and export contracts. The study identifies key factors contributing to load shedding, including inadequate infrastructure, demand forecasting failures, and political influences that prioritize short-term gains over sustainable energy solutions. Furthermore, the paper discusses the potential of diversifying energy sources, such as solar and wind, to mitigate reliance on hydroelectric power and enhance resilience against climate variability. Recommendations for comprehensive strategies to address the energy crisis and improve load management are provided, emphasizing the need for long-term planning and investment in renewable energy initiatives.
创建时间:
2024-09-25
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作