This material is part of the free Environmental Performance in Construction (EPiC) Database. The EPiC Database contains embodied environmental flow coefficients for 250+ construction materials using a
The NSW Government has set operational phase stormwater management targets to achieve waterway health objectives for protecting and restoring the blue-grid in the Wianamatta-South Creek catchment. The
The pilot facility is a cylindrical-shaped bioretention system with 7 m2 of surface area. It consists of the following layers: vegetated surface depression (20 cm), filter substrate (45-58 cm, sandy l
This multi-centre, non-interventional project will aim to enrol consecutive colorectal cancer (CRC) patients at participating sites over at least 10 years. Enrolled patients will undergo collection of