five

CROSSBOW Preliminary net position D-2 results

收藏
NIAID Data Ecosystem2026-03-12 收录
下载链接:
https://zenodo.org/record/4647305
下载链接
链接失效反馈
官方服务:
资源简介:
Outcome of this demonstration shows 24 preliminary net positions for two-days ahead, corresponding to IGM when no market schedules are available, thus TSOs are free to determine required inputs by themselves. Each IGM represents the best possible forecast of transmission system conditions (generation, load, grid topology) for each scenario specified by the TSOs at the time when the IGM is created. Results can be recognized as a precondition for day-ahead cross-border capacity calculation. The more precise the estimates the smaller the adjustments required in order to obtain balanced net positions
创建时间:
2021-03-31
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作