Over a monitoring period of 974 days, two critical parameters were recorded to evaluate the performance of the four foundations. The first parameter, vertical deformations, was measured using dial gau
The BIONICS embankment, located in Northumberland (UK), is 6 m high, 90 m long and orientated approximately east-west with a 1:2 slope, representative of typical UK infrastructure. The embankment comp