five

PIE LTER year 2012, 5 minute and 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA.

收藏
DataONE2018-06-12 更新2024-06-08 收录
下载链接:
https://search.dataone.org/view/https://pasta.lternet.edu/package/metadata/eml/knb-lter-pie/440/1
下载链接
链接失效反馈
官方服务:
资源简介:
Year 2012, continuous measurements, every 5 minutes during the first deployment and then 15 minutes for the remainder of the year, were made of conductivity, water temperature in Bear Brook in Reading, MA, a small headwater stream draining Cedar Swamp, a mainly wetland catchment (49% wetlands and swamp + 36% forest) in the Ipswich River watershed.
创建时间:
2018-06-12
二维码
社区交流群
二维码
科研交流群
商业服务