Avangrid: EV Hosting Capacity (non 3 Phase)
收藏openenergyhub.ornl.gov2024-11-15 更新2025-01-15 收录
下载链接:
https://openenergyhub.ornl.gov/explore/dataset/ui_ev_hc_non3phase_prod/
下载链接
链接失效反馈官方服务:
资源简介:
United Illuminating's EV Hosting Capacity Map provides the available load capacity for the distribution circuits evaluated. The results included herein are an estimate of the remaining circuit section, feeder, and substation hosting capacity to help identify areas where Level 2 and Direct Current Fast Charging (DCFC) stations can likely interconnect with minimal needs for system reinforcement.
联合照明公司的电动汽车充电设施承载能力地图提供了评估的配电电路可用负载容量。其中包含的结果是对剩余的电路段、馈线变电站承载能力的估计,有助于识别二级和直流快速充电(DCFC)站可能实现互联且系统加固需求最小的区域。
提供机构:
openenergyhub.ornl.gov



