Problem Instances for z-block k-crane Scheduling Model in a Yard Terminal
收藏NIAID Data Ecosystem2026-05-02 收录
下载链接:
https://data.mendeley.com/datasets/3nkk9dprpn
下载链接
链接失效反馈官方服务:
资源简介:
Problem Instances and Experimental Results for z-block k-crane Scheduling Model in a Yard Terminal
Data Abstract:
0. Problem Instances
- K: Number of cranes
- Z: Number of blocks
- B: Number of bays within a block
- BL: The far-left bay of blocks
- BR: The far-right bay of blocks
- CBL: The crane operating range left
- CBR: The crane operating range right
- unit: The constant processing time of a single container operation (or movement) by a yard crane
- clearance: The minimum safety distance between two adjacent YCs
- N: Number of tasks, including dummy tasks
- T: Number of time steps in the planning time horizon
- release: The release time of task i
- bay: The bay location of task i
- row: The row location of task i
- tier: The initial layer location of task i. If i is on the top of the stack, then 1
- obs: the time steps required for cranes to move a slot outside of blocks
1. Experimental Results MIP (CPLEX)
- Directory information: problem type (x_block k_crane) / obs (1 or 2) / problem size (n-06 ~ n-12) / problem number (1~5)
- Problem number folder information
- figure.png: A figure of crane trajectory
- log.txt: Engine log of Cplex Optimization Studio
- ~.out files: input data which used in solutionPlot_1.py
- solutionPlot_z-block.py: python file to generate "figure.png"
2. Experimental Results GA-CBS (Java)
- Directory information: problem type (z_block k_crane) / obs (1 or 2)
- File information
- problem_n##.txt: BSF and program run time for problem instances with ## number of tasks
- problem_n##_##.png: The plot of BSF for the problem