Historical loads from 2008. The sum of all inputs is the sum of the inputs from decentralised generation plants and the inputs from adjacent networks of the same network level into the medium-voltage grid. These are either measured (e.g. for EEG over 500 kW) or via feed-in profiles (e.g. small power plants, EEG below 500 kW). The sum of the inputs into the mid-panning network over time is published here. Data from 2008 onwards