遇见数据集

The questionnaire survey of traditional architecture preliminary design workflow

收藏
Mendeley Data2026-04-09 收录
官方服务:

资源简介:

A comparison of the time consumed by the traditional architecture preliminary design workflow and the BIM-based architecture preliminary design workflow is performed to determine the difference between the two. The time-consumption of the traditional design workflow is evaluated in the form of a questionnaire, based on feedback from industry practitioners and experts.

提供机构:
Keyao Wu
二维码
社区交流群
二维码
科研交流群
商业服务