Power at Zone (15Min Avg) ULLADULLA
收藏data.endeavourenergy.com.au2024-06-12 更新2025-01-09 收录
下载链接:
https://data.endeavourenergy.com.au/explore/dataset/power-at-zone-15min-avg-ulladulla/
下载链接
链接失效反馈官方服务:
资源简介:
Historical interval demand data (in megawatts) at Ulladulla Substation Please note The data in these files is the sole property of Endeavour Energy, and we retain all copyright and intellectual property. We accept no liability for the use of this data by any organisation for any purpose. The data is raw data from Endeavour Energy's System Control and Data Acquisition (SCADA) and metering systems and has not been analysed, assessed or validated for accuracy or quality. No warranty or guarantee is provided as to the data's suitability for any particular purpose as it may: contain occasional metering errors that have led to gaps in the data have spikes and dips in metered load caused by switching of the network include estimates about demand due to different types of metering equipment at respective sites have been withheld for confidentiality reasons in accordance with clause (g) of Rule 5.13A, such as where a substation predominantly supplies large individual customers. If you would like to download demand data for all substations at once please use this dataset. Further enquiries Enquiries or feedback can be sent to Asset-information@endeavourenergy.com.au. Please include your name, organisation and the relevant contact details in your email.
历史时段需求数据(以兆瓦计)于Ulladulla变电站 请注意 本数据文件之数据为Endeavour Energy独家所有,我方保留所有版权及知识产权。对于任何组织出于任何目的使用本数据所产生的一切责任,我方概不承担。本数据源自Endeavour Energy的系统控制与数据采集(SCADA)以及计量系统之原始数据,尚未经过分析、评估或验证其准确性或质量。 本数据适用于特定目的之适宜性未提供任何保证或担保,原因如下: 可能含有偶然的计量错误,导致数据出现缺失 可能因网络切换而导致的负载测量值出现峰值和谷值 可能包含因不同类型的计量设备而估算的需求量 根据第5.13A条款第(g)项的规定,出于保密原因而保留,例如变电站主要向大型单个客户供电的情况。 如需一次性下载所有变电站的需求数据,请使用本数据集。 进一步咨询 如有任何疑问或反馈,请发送至Asset-information@endeavourenergy.com.au。请在邮件中包含您的姓名、机构及相关的联系详情。
提供机构:
data.endeavourenergy.com.au



