five

Multi-agent scheduling problems under multitasking

收藏
DataCite Commons2025-11-20 更新2026-02-08 收录
下载链接:
https://borealisdata.ca/citation?persistentId=doi:10.5683/SP3/8Z9SM4
下载链接
链接失效反馈
官方服务:
资源简介:
We consider a multitasking scheduling model with multiple agents, each of which has a set of tasks to perform on a cloudmanufacturing platform on a competitive basis. Each agent wishes to minimise its desirable objective function related tothe completion times of its own tasks only. However, the cloud manufacturing platform wishes to minimise the objectiveof one agent (being long-term critical agent), while keeping the objective of each of the other agents (being short-termone-off agents) within a given limit. The objective functions considered are the maximum of a regular function (associatedwith each task), the total completion time, and the weighted number of late jobs. Cloud manufacturing enables multitaskingscheduling, under which the processing of a selected task may be interrupted by other tasks that are available but unfinished.We ascertain the computational complexity status of each of the problems we consider and devise solution procedures,if viable, for them. We also conduct numerical studies to generate insights into the effects of multitasking on schedulingoutcomes, with which the decision maker can justify making investments to adopt or avoid multitasking.
提供机构:
Borealis
创建时间:
2025-10-11
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作