服務內容
收藏shang-yong.com.tw2025-03-27 收录
下载链接:
https://shang-yong.com.tw/page/one_article_index.php?id=4003
下载链接
链接失效反馈官方服务:
资源简介:
免費丈量,二仟萬產品責任險業界最長12年保固(尼龍除外)裝潢期間另有優惠!桃園隱形鐵窗安裝|台北隱形鐵窗安裝|新北隱形鐵窗安裝其他地方歡迎洽詢!電話洽詢LINE洽詢 01隱形鐵窗安裝安裝規範InstallationSpecifications一、鋼絲繩材質應符合不鏽鋼316材質,股數7*7,包覆12號尼龍膠;鋼索線徑1.8mm(含)以上,披覆尼龍膜後線徑2.1mm(含)以上。二、鋼索間距5cm±0.5cm。三、固定座材質6063T5鋁合金固定座,表面經過陽極處理或粉體烤漆。四、固定座內墊片組件固定鋼索之墊片與螺絲,材質皆應符合不鏽鋼316材質,且螺絲鎖固之螺紋厚度必須大於4mm(含)以上,以防止螺絲崩牙跳脫。五、固定方式壓制鋼索之固定螺絲,皆需鎖緊,避免鋼索鬆脫掉落。固定座採用水泥釘固定於牆面。六、十字扣件材質應符合不鏽鋼316材質,當鋼索長度大於200公分以上時,需視現場需求予以固定之。 02各類大型建案規劃施工政府立案誠信可靠全國隱形鐵窗規劃施工住宅、商業大樓、社區大樓各種大小場域皆可施工!桃園隱形鐵窗規劃施工|台北隱形鐵窗規劃施工|新北隱形鐵窗規劃施工 03安裝代工本公司提供代客安裝服務經驗豐富值得信賴歡迎承包商.設計師.鐵.鋁窗…等同業們來電洽詢!桃園隱形鐵窗安裝代工|台北隱形鐵窗安裝代工|新北隱形鐵窗安裝代工 04材料販售經銷商招募中由廠商選擇自行安裝詳細內容請來電洽詢桃園隱形鐵窗材料販售|台北隱形鐵窗材料販售|新北隱形鐵窗材料販售//其他地方歡迎洽詢!電話洽詢LINE洽詢施工流程STEP.01現場勘查確認位置規格STEP.02準備材料訂製產品尺寸STEP.03表面處理清除表面雜物STEP.04底座固定鑽孔鎖緊底座STEP.05安裝鋼索螺絲固定鋼索STEP.06放壁虎塞沉載耐重較佳STEP.07檢查調整確認調整細節STEP.08清理驗收完工整理交付
Free measurement, 12-year warranty on 20 million product liability insurance in the industry (excluding nylon), additional discounts during installation! Taoyuan Hidden Iron Window Installation | Taipei Hidden Iron Window Installation | New Taipei Hidden Iron Window Installation. Other locations welcome inquiries! Call for consultation | LINE consultation. Installation Specifications: 1. The wire rope material should meet stainless steel 316 specifications, 7 strands in 7 groups, covered with 12mm nylon adhesive; the steel wire diameter should be 1.8mm or above, and the wire diameter after covering with nylon film should be 2.1mm or above. 2. The distance between steel wires should be 5cm ± 0.5cm. 3. The fixing bracket is made of 6063T5 aluminum alloy, and the surface is treated with anodizing or powder coating. 4. The fixing bracket inner pad components, which fix the steel wire pads and screws, should be made of stainless steel 316 material, and the thread thickness of the screws must be greater than 4mm or above to prevent screw loosening and jumping off. 5. The fixing method involves locking the fixing screws that compress the steel wire, to prevent the steel wire from loosening and falling off. The fixing bracket is fixed to the wall with cement nails. 6. The cross piece material should meet stainless steel 316 specifications, and when the steel wire length is more than 200cm, it should be fixed according to the on-site requirements. 02 Planning and construction for various large-scale projects. Government-registered, reliable, and nationwide hidden iron window planning and construction services for residential, commercial buildings, and community buildings in all sizes. Taoyuan Hidden Iron Window Planning and Construction | Taipei Hidden Iron Window Planning and Construction | New Taipei Hidden Iron Window Planning and Construction. 03 Installation outsourcing. Our company provides customer installation services with rich experience and is值得信赖. Welcome contractors, designers, iron, and aluminum window professionals to call for consultation! Taoyuan Hidden Iron Window Installation Outsourcing | Taipei Hidden Iron Window Installation Outsourcing | New Taipei Hidden Iron Window Installation Outsourcing. 04 Material wholesale distributor recruitment. Manufacturers can choose to install themselves. For detailed information, please call for consultation. Taoyuan Hidden Iron Window Material Wholesale | Taipei Hidden Iron Window Material Wholesale | New Taipei Hidden Iron Window Material Wholesale. Other locations welcome inquiries! Call for consultation | LINE consultation. Construction Process: STEP.01 On-site inspection to confirm location and specifications. STEP.02 Prepare materials and customize product dimensions. STEP.03 Surface treatment to remove surface debris. STEP.04 Fix the base by drilling and locking it in place. STEP.05 Install the steel wire and fix it with screws. STEP.06 Place the wall gecko for better load-bearing capacity. STEP.07 Check and adjust to confirm details. STEP.08 Clean up and deliver upon completion.
提供机构:
shang-yong.com.tw



