Power at Zone (15Min Avg) FIGTREE
收藏data.endeavourenergy.com.au2024-06-12 更新2025-01-08 收录
下载链接:
https://data.endeavourenergy.com.au/explore/dataset/power-at-zone-15min-avg-figtree/
下载链接
链接失效反馈官方服务:
资源简介:
Historical interval demand data (in megawatts) at Figtree Substation Please note The data in these files is the sole property of Endeavour Energy, and we retain all copyright and intellectual property. We accept no liability for the use of this data by any organisation for any purpose. The data is raw data from Endeavour Energy's System Control and Data Acquisition (SCADA) and metering systems and has not been analysed, assessed or validated for accuracy or quality. No warranty or guarantee is provided as to the data's suitability for any particular purpose as it may: contain occasional metering errors that have led to gaps in the data have spikes and dips in metered load caused by switching of the network include estimates about demand due to different types of metering equipment at respective sites have been withheld for confidentiality reasons in accordance with clause (g) of Rule 5.13A, such as where a substation predominantly supplies large individual customers. If you would like to download demand data for all substations at once please use this dataset. Further enquiries Enquiries or feedback can be sent to Asset-information@endeavourenergy.com.au. Please include your name, organisation and the relevant contact details in your email.
历史时间间隔内图树变电站的电力需求数据(以兆瓦为单位),请注意,这些文件中的数据为Endeavour Energy的专有财产,我们保留所有版权和知识产权。对于任何组织出于任何目的使用这些数据,我们不承担任何责任。这些数据为Endeavour Energy的系统控制和数据采集(SCADA)及计量系统的原始数据,未经分析、评估或验证其准确性或质量。对于数据是否适合特定用途,我们不提供任何保证或担保,因为数据可能:包含偶尔的计量错误,导致数据出现间断;由于电网切换导致的计量负载的峰值和谷值;包含因不同类型的计量设备而产生的需求估计;根据第5.13A规则第(g)款的规定,出于保密原因而保留,例如变电站主要向大型单个客户供电的情况。如需一次性下载所有变电站的需求数据,请使用此数据集。如有进一步咨询,咨询或反馈可通过Asset-information@endeavourenergy.com.au发送。请在电子邮件中包括您的姓名、组织以及相关联系信息。
提供机构:
data.endeavourenergy.com.au



