five

Economic parameters and summarized costs for calculating net present value (NPV) for each scenario

收藏
DataCite Commons2020-09-04 更新2024-07-25 收录
下载链接:
https://iop.figshare.com/articles/dataset/___Economic_parameters_and_summarized_costs_for_calculating_net_present_value_NPV_for_each_scenario/1011609/1
下载链接
链接失效反馈
官方服务:
资源简介:
<b>Table 3.</b> Economic parameters and summarized costs for calculating net present value (NPV) for each scenario. All dollars in $2009. <strong>Abstract</strong> This letter compares several bounding cases for understanding the economic viability of capturing large quantities of anthropogenic CO<sub>2</sub> from coal-fired power generators within the Electric Reliability Council of Texas electric grid and using it for pure CO<sub>2</sub> enhanced oil recovery (EOR) in the onshore coastal region of Texas along the Gulf of Mexico. All captured CO<sub>2</sub> in excess of that needed for EOR is sequestered in saline formations at the same geographic locations as the oil reservoirs but at a different depth. We analyze the extraction of oil from the same set of ten reservoirs within 20- and five-year time frames to describe how the scale of the carbon dioxide capture, utilization, and storage (CCUS) network changes to meet the rate of CO<sub>2</sub> demand for oil recovery. Our analysis shows that there is a negative system-wide net present value (NPV) for all modeled scenarios. The system comes close to breakeven economics when capturing CO<sub>2</sub> from three coal-fired power plants to produce oil via CO<sub>2</sub>-EOR over 20 years and assuming no CO<sub>2</sub> emissions penalty. The NPV drops when we consider a larger network to produce oil more quickly (21 coal-fired generators with CO<sub>2</sub> capture to produce 80% of the oil within five years). Upon applying a CO<sub>2</sub> emissions penalty of 60$2009/tCO<sub>2</sub> to fossil fuel emissions to ensure that coal-fired power plants with CO<sub>2</sub> capture remain in baseload operation, the system economics drop significantly. We show near profitability for the cash flow of the EOR operations only; however, this situation requires relatively cheap electricity prices during operation.
提供机构:
IOP Publishing
创建时间:
2016-01-18
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作