遇见数据集

Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS

收藏
DataCite Commons2020-08-19 更新2025-04-09 收录
官方服务:

资源简介:

EGS field projects have not sustained production at rates greater than ½ of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igneous rock within the 3,000-10,000 ft depth range. Our goal is to develop a novel fracturing fluid technology that maximizes reservoir permeability while reducing stimulation cost and environmental impact. Laboratory equipment development to advance laboratory characterization/monitoring is also a priority of this project to study and optimize the physicochemical properties of these fracturing fluids in a range of reservoir conditions. Barrier G is the primarily intended GTO barrier to be addressed as well as support addressing barriers D, E and I.

创建时间:
2014-08-05
二维码
社区交流群
二维码
科研交流群
商业服务