five

Penobscot River Cross Section Data pre- and post-Dam Removal

收藏
U.S. Geological Survey2021-01-01 更新2026-04-23 收录
下载链接:
https://www.sciencebase.gov/catalog/item/6054b33fd34e1894882d0794
下载链接
链接失效反馈
官方服务:
资源简介:
The Great Works (20 feet high) and Veazie (30 feet high) dams on the lower section of the Penobscot River in Maine were removed during the summers of 2012 and 2013, respectively. Channel cross sections upstream and downstream of these dams from just below the Milford Dam to the head?of?tide at Eddington Bend just below the former Veazie Dam were surveyed before and after the dams were removed in order to assess changes in the channel as a result of the dam removals. Cross sections were referenced to stable monuments set on the left and right banks of each cross section to ensure consistent cross section locations. Data for each cross section include total station theodolite survey data integrated with Acoustic Doppler Current Profiler (ADCP) depth data referenced from the water surface at the time of the survey to make up integrated cross sections.
创建时间:
2021-01-01
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作