Supplementary Data for Comparative Study on the Use of S Curve-Bar Chart and Ms Project-Pdm Methods in Scheduling and Controlling Building Construction Project

收藏
Figshare2021-02-19 更新2026-04-28 收录
官方服务:

资源简介:

Building construction projects have very complex activities, so they require precise and accurate methods of scheduling and control. Using the right method, the project executor can carry out the project according to plan and can be controlled if there is schedule deviations. This study aims to compare the effectiveness of using the Bar Chart-curve-S and Ms. Project-PDM methods on scheduling and controlling building construction projects. The method used by contractors in scheduling and controlling a project is the Bar Chart-S curve and Ms. Project-PDM method.