Project plan used in MCMC- Primavera Risk Analysis File
收藏NIAID Data Ecosystem2026-03-11 收录
下载链接:
https://doi.org/10.7910/DVN/YJU3QU
下载链接
链接失效反馈官方服务:
资源简介:
This file contains the master plan for a construction project. Moreover, this is the basis of Beta-S model which is used in Bayesian Updating method to predict the total duration of the proposed project. The project plan consists of 50 activities and the total planned duration of 1100 days. The uncertainties of all activities and their probable correlations to other activities are defined. This plan is a real project plan in the field of construction.