遇见数据集

Inhibition of Return and Learned Value: Data, code, and materials

收藏
Zenodo2026-11-04 更新2026-11-05 收录
官方服务:

资源简介:

Data, analysis code, results, and task materials for the manuscript "Inhibition of Return and Learned Value". The repository includes the trial-level data of Experiments 1 and 2, the OpenSesame tasks, the scripts used for all analyses, the cached results and figures, and the Quarto source file of the manuscript. See README.md for the structure of the repository and how to reproduce the analyses.

提供机构:
Zenodo
创建时间:
2026-11-04
二维码
社区交流群
二维码
科研交流群
商业服务