five

Coordination of electrical drilling machines in open-pit mines: a constraint programming approach

收藏
DataCite Commons2026-03-20 更新2026-02-09 收录
下载链接:
https://tandf.figshare.com/articles/dataset/Coordination_of_electrical_drilling_machines_in_open-pit_mines_a_constraint_programming_approach/30355430/1
下载链接
链接失效反馈
官方服务:
资源简介:
This article addresses the efficient coordination of multiple electrical drill rigs in open-pit mines, considering unique constraints such as continuous power supply, dynamic obstacle creation, and safe distancing. The objective is to maximise drilling within a given time horizon. This paper provides a comprehensive problem description and proposes a constraint programming model complemented by a heuristic algorithm. Experimental results demonstrate the model’s effectiveness in scheduling up to 300 tasks with 3 machines over 24 hours, achieving near-optimal solutions within 2 minutes. For instances with fewer than 250 tasks, the model consistently reaches optimal solutions, enabling real-time decision-making in dynamic mining environments.
提供机构:
Taylor & Francis
创建时间:
2025-10-14
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作