遇见数据集

14.1. Ink-jet bioprinting nozzle aperture time impact on cell viability of human adipose-derived mesenchymal stem cells.

收藏
Zenodo2025-05-27 更新2026-05-26 收录
官方服务:

资源简介:

AD-MSCs were bioprinted with the ink-jet device at different nozzle aperture times (milliseconds) to investigate the impact of the aperture time variable on cell mortality. Three different experiments were made: MK1, MK2 and MK3. Files provided: Excel file: compilation of all the results; sample codes describing the sample registered in the flow citometry files. Analysis and plotting of the results. ZIP folders: raw data from the three experiments (MK1, MK2 and MK3). Controls were taken: Cells after trypsination, before inclusion in the bioink. Cells in the bioink prior to bioprinting. Cells that were subjected to the pressure in the cartridge during the whole process of bioprinting, but were not bioprinted, then being a control of the cells being in the bioink for the whole duration of the jetting process.

提供机构:
Zenodo
创建时间:
2025-05-27
二维码
社区交流群
二维码
科研交流群
商业服务