five

Monitoring Plan for the Construction Phase of the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O’odham Nation: Executive Summary

收藏
DataONE2015-05-05 更新2024-06-27 收录
下载链接:
https://search.dataone.org/view/doi:10.6067:XCV85T3MM1_meta$v=1430853966764
下载链接
链接失效反馈
官方服务:
资源简介:
This is part of the San Xavier Farm Rehabilitation Project. Additional entries related to this project can be found at the following link: https://core.tdar.org/collection/27482 The Bureau of Reclamation (Reclamation) is assisting the San Xavier District (District) of the Tohono O’odham Nation and the San Xavier Farm Cooperative in the extensive rehabilitation of approximately 1,700 acres of active and fallow farmland along the Santa Cruz River at San Xavier. The major impacts to fields and some adjacent lands will be from installation of water pipelines, laterals, and vaults; reconstruction of drainage channels; and construction of dikes to prevent storm water runoff, including an extension of the Arizona Department of Transportation (ADOT) dike under Interstate 19 (I-19) at the Papago Interchange. The project is covered by a Memorandum of Agreement between Reclamation, San Xavier District, Bureau of Indian Affairs, and State Historic Preservation Office, including a burial agreement plan. Archaeological Consulting Services, Ltd. (ACS) recently completed intensive testing within the proposed rights-of-way of the various project components (January–March, 2005) (report at tDAR ID: 393788, leading to the identification of three archaeologically sensitive areas. This construction monitoring plan utilizes the fieldwork data for establishing monitoring protocols and procedures to be followed during the construction phase. All reports will conform to the Secretary of the Interior format Standards of Final Reports of Data Recovery Program (42 FR 5377-79) and those stipulated by Reclamation for this contract. The major elements of this monitoring plan were to identify the responsibilities of each party, establish contacts and protocol for notification and consultation communication, and to clearly identify consequences of noncompliance to construction schedule and in terms of liability to the Contractor. Contractor Specifications prepared by Reclamation clearly discussed the various monitoring conditions described in this plan. This document presents the executive summary of the monitoring plan. The longer version can be found at tDAR ID: 393799. Photos taken during the monitoring can be found at tDAR ID:393802. The photo log can be found at tDAR ID: 393801.
创建时间:
2015-05-05
二维码
社区交流群
二维码
科研交流群
商业服务