Hosting Capacity Analysis Methodology and Assumptions: The Battery Energy Storage Hosting Capacity data that is being provided is for information purposes only and is not intended to be a substitute for the established interconnection process. The analyses presented in these displays provide the feeder level energy storage hosting capacity for the distribution circuits evaluated. Hosting Capacity for energy storage is an estimate of the amount of charging and discharging that may be accommodated without adversely impacting power quality or reliability under current configurations and without requiring infrastructure upgrades. Please note that this analysis was conducted under current configurations, and prior to infrastructure upgrades such as; installing a recloser or remote terminal unit at the Point of Common Coupling, replacing a voltage regulating device or controller to allow for reverse flow, substation-related upgrades including 3V0 protection, or other protection-related upgrades. For the Stage 1 displays, each circuit’s hosting capacity is determined by evaluating the potential power system criteria violations as a result of charging and discharging systems. The analyses represent the overall feeder level hosting capacity only, and do not account for all factors that could impact interconnection costs. Please note that issues related to circuit protection require further analysis to make a definitive determination of hosting capacity. Additional displays with tabulated data have been included in the form of data pop-up displays.
承载能力分析方法与假设:所提供的电池储能承载能力数据仅用于信息参考,并不旨在替代既定的并网流程。本显示中呈现的分析提供了评估的配电线路的馈线级储能承载能力。储能承载能力是对在当前配置下,不损害电力质量或可靠性,且无需基础设施升级的情况下,可能容纳的充放电量的估计。请注意,此分析是在当前配置下进行的,并在基础设施升级之前,例如在公共耦合点安装重合闸或远程终端单元、更换电压调节装置或控制器以允许反向流动、变电站相关升级包括3V0保护或其他与保护相关的升级之前进行的。对于第一阶段显示,每个回路的承载能力是通过评估充放电系统可能导致潜在的电力系统标准违规来确定。这些分析仅代表馈线级的整体承载能力,且未考虑所有可能影响并网成本的因素。请注意,与回路保护相关的问题需要进一步分析,以做出承载能力的最终确定。此外,还包含了以数据弹出显示形式呈现的包含表格数据的附加显示。
提供机构:
openenergyhub.ornl.gov